This project was 11 squares or 1,100 square feet. We removed the existing shingles and installed a Max-Rib metal roof. We did not do any work on the flat roof. The homeowner currently has a foam roof on the flat roof and we do not specialize in foam roofing. The color of the new metal roofing is Autumn Red. We replaced 10 feet of 1X8 fascia. We installed new 2X2 metal drip edge, a peel and stick ice and water shield at the foam tie-in, and Tiger Paw underlayment on the rest of the roof.

We installed new 26 gauge metal panels, ridge and rake trim, neoprene pipe boot flashings, and foam closure at all ridge and eaves. We worked on this roof for two days. The first day we had 5 men working from 7 AM until 4 PM and on the second day we had 4 men working from 1:45 PM until 4:30 PM. We pulled a city permit for this work and passed final inspection. Our metal roofs carry a full 10 year labor warranty.